Great progress has been made on the boiler of NGG13 number 49 at Reefsteamers as it is prepared for retubing.

The old tubes have been removed and the tube plates cleaned. The boiler barrel has been descaled and washed out and subject to MPI (Magnetic Particle Inspection) as have the tube plates. The initial report is that all is well. A full boiler inspection by the Boiler Inspector prior to commencing the retube will take place next week. The tubes have been cut to length ready to be fitted.

Our pictures from Reefsteamers show the boiler being descaled and washed out and the flue tubes being annealed ready for fitment and the small tubes after being cut to size.