The NG10 frames begin to take shape.

The recently refurbished front bogie has been placed under the frames of NG10 number 61 in Bloemfontein as the locomotive restoration moves forward. A new ashpan as per the picture has also been fabricated by Lukas Nel and his team and awaits the rebuilt boiler from Keith Stevens towards the end of November.

IMG 20171026 WA0004

 

IMG 20171026 WA0005