RN411 - The guys at the Bloemfontein workshops have already got down to business with No. 88

The Bloemfontein team has already stripped the tubes from the NGG16 No. 88 boiler.
The wheels are being stripped off the three O & K locomotives to be cleaned simultaneously.
We will keep you updated!

No. 88 with her boiler tubes stripped
The O&K wheels