Sandstone Estates Sandstone Estates
  • Home
  • Modern Farming
  • About Us
  • In the Press
  • Map
  • Contact Us

Accommodation at Sandstone

A TASTE OF SANDSTONE

Visiting Sandstone

NCACC certificate

logo1

RS Regulator Permit

RSRlogo

Sandstone Heritage

  • About Us
  • Accommodation
  • Railway Heritage
    • 2ft Narrow Gauge
    • 3ft 6" Cape Gauge
    • Bloemfontein Shed
    • Model Engineering
  • Military Vehicles
    • Sherman MK IV
  • Agricultural Heritage
  • Architectural Heritage
  • Earth Moving Machines
  • Stationary Engines
  • Commercial Transport
  • Classic Cars
  • Traction Engines
  • Rare Breeds
  • Maritime Heritage
  • Sandstone Inventory
  • Video Gallery
  • General News
  • Newsletters
  • Online Shop
  • Your Cart

Railway Heritage

Featured

4AR number 1555

08 July 2018

Work continues at Bloemfontein on Phase 1 of the cosmetic restoration of this loco for Transnet. After stripping the locomotive as in our last report  attention is now concentrated on descaling the various components. Our pictures from Lukas Nel show work on the cab, tender tank and boiler.

IMG 20180706 WA0000

Read more: 4AR number 1555
Featured

More news on the NG10

04 July 2018

As we are fabricating many parts from scratch we have had to slow down a bit but will soon pick up the pace. Our pictures from Lukas Nel show the newly fabricated reversing ratchet, part of the drop grate, the finishing touches on the roof and more small parts for the regulator assembly and main steam pipe.

IMG 20180703 WA0000

Read more: More news on the NG10
Featured

NGG13 49 The re tube

04 July 2018

Great progress has been made on the boiler of NGG13 number 49 at Reefsteamers as it is prepared for retubing.

The old tubes have been removed and the tube plates cleaned. The boiler barrel has been descaled and washed out and subject to MPI (Magnetic Particle Inspection) as have the tube plates. The initial report is that all is well. A full boiler inspection by the Boiler Inspector prior to commencing the retube will take place next week. The tubes have been cut to length ready to be fitted.

Our pictures from Reefsteamers show the boiler being descaled and washed out and the flue tubes being annealed ready for fitment and the small tubes after being cut to size.

Descaling 2

Read more: NGG13 49 The re tube
Featured

Moving along with the NG10

27 June 2018

As mentioned in our last report there are numerous small items that take up a lot of time to complete. Our pictures from Lukas Nel show the chimney in its first stages of fabrication (when received the locomotive had a wooden replica), the inner cab wooden roof in place, the boiler flange for the turret and the regulator valve in its first stages of fabrication.

Although seemingly small tasks they all go together towards the restoration of this special locomotive.

IMG 20180626 WA0002

Read more: Moving along with the NG10
Featured

Latest Steam report June 2018

21 June 2018

Steam Report Jun 2018

The latest Steam Report - Click here to read 

Featured

NGG13 number 49.

17 June 2018

Work has now begun on stripping the loco at Reefsteamers in Germiston for the retubing with the removal of the ashpan,  fire bars and brick arch as our pictures from Reefsteamers show. Luckily a cracked fire bar was discovered during the process which will be replaced when the locomotive is re-assembled at Sandstone.

Sandstone has awarded the contract to Reefsteamers as they have the correct facilities to engineer the work and also to assist the club with income for their preservation efforts.

ashpan 1

Read more: NGG13 number 49.
Featured

The restoration of Class 4AR

06 June 2018

The restoration of Class 4AR number 1555 foe Transnet Foundation.

The locomotive and tender have now been completely stripped and the cleaning process has begun. With bitterly cold temperatures in Bloemfontein an impromptu boiler has been set up for warmth!

IMG 20180606 WA0001

Read more: The restoration of Class 4AR
Featured

NG10 update 6 June 2018

06 June 2018

Work continues on the cab and its fittings with the installation of the cab surround and the window frames. The next task is to fit the regulator assembly.

IMG 20180606 WA0005

Read more: NG10 update 6 June 2018
Featured

4AR number 1555

29 May 2018

Work has now begun on the stripping and cleaning of the second locomotive for the Transnet tender at Bloemfontein. The 1913 North British built 4AR locomotive number 1555 awaits its place in the new museum at Bloemfontein after spending over 30 years in storage. As can be seen from our pictures it is much poorer condition than the NZASM “B” tank recently completed. Some damage is evident on the running boards plus serious corrosion to the cladding.

The locomotive has been separated from its tender which has been fitted with new bearings and axle box keeps and covers. The cab has been removed and our pictures show the deterioration of the cladding and the generally poor condition of 1555. Not surprising after so long in open air storage.

IMG 20180525 WA0006

Read more: 4AR number 1555
Featured

Further progress on the NG10 at Bloemfontein.

26 May 2018

The locomotive continues to take shape as the brass boiler bands have now been fitted and work is well underway on completing the cab.

IMG 20180525 WA0000

Read more: Further progress on the NG10 at Bloemfontein.
Featured

NG10 number 61.

19 May 2018

Work has progressed with this restoration with completion of the fitment of the running boards together with fitting the boiler bracing bars to the front of the smokebox and  frames. The next project is now the completion of the cab and its fittings.

IMG 20180518 WA0001

Read more: NG10 number 61.
Featured

Cosmetic Restoration of NZASM “B” number 230

19 May 2018

The stripping, cleaning and painting of this locomotive is now complete at Bloemfontein. All the loose parts will now be safely secured. Another tender will be issued by Transnet shortly for the assembly and final painting of the locomotive.

A job well done by Lukas Nel and his team.

The crew will now move on to the other locomotive in the tender,4AR number 1555.

IMG 20180518 WA0000

Read more: Cosmetic Restoration of NZASM “B” number 230
Featured

NGG13 number 49 arrives at Germiston.

15 May 2018

The boiler section of number 49 has now arrived in Johannesburg at Reefsteamers where it was offloaded by the Reefsteamers crane. This was originally a steam crane but is operated now by compressed air directly to its cylinders. Number 49 was offloaded from the Sandstone lowbed together with the new boiler tubes and placed on a DZ truck for movement into their main workshop. Here it will be lifted by the workshop gantry crane from the DZ and placed on blocks for the retubing to begin shortly.

Our pictures from Reefsteamers show 12AR 1535 hauling the crane into position and the lifting process from the lowbed to the DZ.

IMG 20180515 WA0003

Read more: NGG13 number 49 arrives at Germiston.
Featured

Latest Steam Report 15 May 2018

15 May 2018

The latest steam report from the Steam Team at Sandstone

The latest steam report from the Steam Team at Sandstone - Click here to view

Featured

Photographic exhibition on May 24th

14 May 2018

Sandstone has a long association with the James Hall Museum of Transport and they have extended an invite to all for a photographic exhibition on May 24th on the History of Trams in Johannesburg. Well worth a visit.

Click here to view

Page 10 of 76

  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  1. You are here:  
  2. Railway Heritage
  • Home
  • Modern Farming
  • About Us
  • In the Press
  • Map
  • Contact Us