NGG16 Number 113 to be retubed.

NGG16 number 113, built by Beyer Peacock in 1939, has been moved to Sandstone’s Bloemfontein Workshops for re tubing. The locomotive was acquired from the Midmar project in 1998 but did not enter traffic at Sandstone until February15th 2003 after a full overhaul in the Hoekfontein Workshops. The locomotive was withdrawn from traffic in April 2017. Our pictures from Lukas Nel show 113 after delivery to Bloemfontein and alongside NG10 number 61.Work on the NG10 will continue alongside the repairs to 113.

IMG 20171204 WA0000

 

IMG 20171204 WA0001