Update on NGG16 number 113

This is our last report for 2017 before the workshop in Bloemfontein closes for the holiday break on Friday the 15th. All the tubes have now been removed from the boiler as our pictures show and the boiler will now be descaled. The tube plates will also be tested and inspected before the retubing commences. This will be during the early part of 2018.

IMG 20171214 WA0000

 

IMG 20171214 WA0001

 

IMG 20171214 WA0002