The restoration is now picking up pace with the fabrication of the regulator lever assembly and its fitment to the boiler backhead. The main steam pipes have now been assembled in the smokebox.
The restoration is now picking up pace with the fabrication of the regulator lever assembly and its fitment to the boiler backhead. The main steam pipes have now been assembled in the smokebox.