Class NG10 number 61: The cab moves forward.

Great progress has been made on the cab fittings as our pictures show. As mentioned in our last report the regulator assembly has been fabricated and fitted and now the boiler mounts on the backhead have been made up from various spares we had together with the vacuum ejector. The firebox door has been made from scratch and fitted. She’s looking good!

IMG 20180829 WA0000

IMG 20180829 WA0002

IMG 20180829 WA0003