RN354 - The last of the Garratts has arrived from Port Shepstone

These photographs show the work that has to be done in reassembling an NGG16 Garratt from components.

An engine unit is shunted into position.
One engine unit is aligned to the boiler, the second one to follow.
It all comes together.
What would we do without our little Funkey Mine Diesel?