The tubes are prepared for NGG16 Number 113

The boiler tubes have now been swaged and annealed ready for fitment into the boiler of number 113. Our pictures show the tubes being swaged and then annealed and cooled by being covered with clean sand.

IMG 20180221 WA0000

 

IMG 20180221 WA0001

IMG 20180221 WA0002

IMG 20180221 WA0003