Senior executives and trustees of the Sandstone Heritage Trust recently paid a visit to Rovos Rail and met with the founder and owner of Rovos Rail, Rohan Vos. As luck would have it the Sandstone Heritage Trust's GMAM, No. 4079, was in steam preparing to haul one of the trains to Cape Town.
The two organisations discussed a wide range of issues which include the possible supply of additional locomotives on loan to Rovos Rail to meet increasing demand for their prestige rail passenger services. Captions: |
![]() |
![]() |
|
|
Mike Myers (left) of the Sandstone Heritage Trust
and Rohan Vos (right). |
|
|
|
![]() |
|
Veteran driver and consummate steam professional Cliff Petzer on the footplate of Sandstone Estate's GMAM, No. 4079.
|
Last year the Sandstone Heritage Trust sold a Land Rover fire fighting unit to Rovos Rail. It is on standby duty 24-hours a day.
|
![]() |
|
|
One of Rovos Rail's immaculately presented 19D locomotives. Note the young Japanese girl posing for a photograph prior to departure.
|
|
![]() |
|
|
Sandstone Heritage Trust - Rail News
RN 272 - Weekly Report by Gert Jubileus - 10th - 15th October 200616th October 2006
The Ratanga Locomotive
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
During last week, the Ratanga Locomotive frame was de-scaled and this week Henry spray-painted the wheels and the frame. The Buffer beam was sprayed red and the wheel tires were painted white. Henry then fitted back the wheels and started to fit back the motion of this Little Locomotive. The cab was sanded and prepared to be spray painted in next week. The boiler is in Bloemfontein and Lukas Nel needs to expand the tubes with a special little tube expander that was ordered.
Below are photos of the restoration of the Little Locomotive: |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Below are photos of Henry while he was fitting back the wheels and the motion.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
| CLASS NGG 16 NUMBER 153 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
| This week Derrick fitted the remaining loose pipes back and also packed the expansion joint while it still was easy to reach. He I busy with repair work to the bunker of 153. Below are photos of the Derrick busy with repair work to 153. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
| THE FUNKEY DIESEL LOCOMOTIVE: This week the little diesel locomotive worked very hard, shunting Hoekfontein station as well as wagons to Mooihoek Station for storage. She was used on Monday to shunt a Flat wagon to load a Garratt Unit at Pandora. The Unit then was shunted to Hoekfontein and was offloaded. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Funkey on her way to Mooihoek
|
The Funkey just after returning from Pandora.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Below are some images of the Funkey performing shunting duties in Hoekfontein Station. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
| She then was used to shunt wagons to Mooihoek station. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Below are more images of the Funkey in action, with Derrick behind the controls. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
| The Sandstone Estates Freightliners arrived from Port Shepstone late Thursday afternoon, loaded with three flat wagons and three containers. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
| We offloaded the trucks early on Friday morning. First we offloaded the flat wagons. Below are photos of the offloading! |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
| After the wagons were placed on the rails, we offloaded the containers. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
| The Funkey rushed to our rescue and shunted the flat wagons to load the containers onto. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Below are images taken of the loading of the containers onto the flat wagons. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
|
|
This week saw a very hectic week down at the Steam Shed. We started the week with an audit from the Rail Safety Regulator and end the week with steaming the 1895 Lawley for a short passenger train from Hoekfontein to Grootdraai. The Inspectors of the Rail Safety Regulator visits all the operators in South Africa to perform a general audit on Railway Safety. We also went out on a Track inspection on the entire Rail network of the Sandstone Steam Railway and then a audit was done on the file systems that is in place to ensure safe running of trains on the Sandstone Railways. Below: The Railway Safety Inspectors, Mr. Daan Le Roux and Mr. Justus Marais. Track inspection on the left and auditing the books, files and rail standards on the right. |
|
![]() |
![]() |
|
SANDSTONE STEAM RAILWAY LOCOMOTIVES:
THE FUNKEY: This week, the Funkey diesel locomotive continued to shunt wagons to Mooihoek station for storage purposes. Below are photos of Derrick performing shunting duties in Hoekfontein Station before shunting wagons to Mooihoek. |
|
![]() |
|
![]() |
![]() |
![]() |
|
|
THE PECKETT: This week Derrick fitted a vacuum steel pipe to the Peckett locomotive. A ejector will be overhauled in next week and will be fitted to this marvelous locomotive to enable her to work vacuum trains. First Derrick had to work out where the pipes should be fitted, not to spoil this great looking locomotive. Below are photos taken while Derrick fitted the vacuum pipes. |
|
![]() |
![]() |
![]() |
|
|
Henry manufactured a coupler beam that will be bolted onto buffer beam of this locomotive. This was done to enable us to couple any type of wagon to this locomotive. The original couplers will remain in the same position. This locomotive was designed with a different coupler that was unique for the Railways she used to work on.
Below are some photos taken of the new coupler for this locomotive. |
|
![]() |
![]() |
| THE LAWLEY: Before we steamed the Lawley, she was shunted to the put for a under frame inspection. |
|
![]() |
|
| Part of this inspection was to inspect each and every bolt and nut on the locomotive with a special inspection hammer. This is the key to a flawless performance of a locomotive and not one locomotive will dare to go out of the shed if not inspected with the hammer. | |
![]() |
![]() |
| Below is a photo taken of the side control springs on the pony of the Lawley. | |
![]() |
|
| The passenger wagons were also shunted to the put for an inspection and brake adjustments. | |
![]() |
|
| Finally, the Lawley could couple up to her wagons and a vacuum brake test and leak off test was done. At 12H30 we departed from the shed and took the train to Hoekfontein station. | |
![]() |
|
![]() |
|
![]() |
|
| The train departed to Grootdraai at 15H 35 and arrived at 15H50 for a short stop to take some late afternoon pictures. Below: Mr. And Mrs. Mole, Rhys and Norma Rolfe from Viljoenskroon, and Mike and Helen Mullin from Perth. | |
![]() |
|
| To view a short video clip of the Lawley in steam, click here >>> (For PC users, right click and save file. For Mac users, control click and save linked file) |
|
![]() |
|
| Lindie and the Lawley, Mr. Mole’s favorite ladies! | |
| SEMAPHORE SIGNALS: The Home signal for Hoekfontein Station was moved down to the shed and the restoration of this signal is currently in progress. Below is a photo of this signal. |
|
![]() |
|
| GENERAL: Ben closed five wooden tolls this week and fitted vacuum pipes and couplers to all the wagons recently restored. Oupa bagged the coal spillage at the coal stage. These bags of coal will be used to coal the little Locomotives. Below is a photo of the wooden tools. |
|
![]() |
|
| PLANNING FOR NEXT WEEK: 1.) To strip vacuum cylinders and bogeys from the wagons at Port Shepstone. 2.) To overhaul an ejector for the Peckett. 3.) To do the valve setting of the Lawley. 4.) To go on with the restoration of the Home signal. 5.) To make and fit couplers to the Peckett. 6.) To spray weeds on the storage line in Hoekfontein Station. 7.) To move the bags of coal into the Coal stage. 8.) To ballast 3’6” storage line in Hoekfontein (lift and pack) 9.) To build an overhead column for the locomotives. 10.) Track maintenance section Mooihoek -Vailima. |
|
![]() |
|
Posted by: "
Wed Oct 18, 2006 4:49 am (PST)
Hallo All!
We were told yesterday that no special passenger trains will be allowed from 2007 onwards.
It is indeed very sad, but it was clear that the decision was taken much higher up in Spoornet and we had to accept it. At least we can look back at more than eleven years in which we were privileged to share the wonderful scenery of Southern Africa with thousands of passengers.
Even if we only received one report like Quinten's, it was worth it and one is indeed sad that this will no longer be possible. Fortunately we still have six trips left, of which three (Namibia and two Cherry Safaris) are fully booked. The others (Komatipoort weekend, Nine Provinces and Two Oceans) will most probably run to maximum capacity as well.
Regards
Boon.

Sandstone Heritage Trust - Rail News
27th October 2006
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
SANDSTONE STEAMS AGAIN
This week we shunted “Sandy”, our 92 year old Fowler Locomotive from the sheds and steamed her to haul a Passenger train from Hoekfontein to Grootdraai and Vailima. The Armour Museum gave training on the Estates for the Military troops. In the photo above they posed for a photo with Mr.Mole and Hester Papenfus, office manager, in front of the Fowler at Grootdraai near the Lesotho border. Just left of Mr. Mole is their Instructor, Andrew Doyle. The Fowler Locomotive hauled her train with ease and I could feel that she was happy to steam down the tracks. This was good exercise for the locomotive and it gave me the opportunity to log all the repairs that were needed. All the locomotive repairs are logged in one repair book and this helps me to keep track of what has been done and what needs to be done. Below are more photos of Sandy’s steaming day! |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Click here for a VIDEO CLIP OF SANDY!!! (For windows users, right click and save/play) Mac users, control - Click, you know what to do. Sandy’s right injector clack got stuck open while we were on our way to Vailima, the cut-off valve was closed and the injector was put to work again. Although the injector worked again, we stripped both injector cones and clack valves. The injector cones were cleaned and the clack valves were seated with fine grinding paste. The cones were laid over the weekend in a special mix of soap to clean off all hard salts that cannot be accessed due to the size of this little injector cones. Below are photos taken of the repair work to both Sandy’s injectors. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Left injector |
The cut-off valve
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The cone and clack valve
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The left Injector
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| CLASS NGG 16 Number 153 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| This week Derrick finished the repair work that was needed inside the bunker of 153. He welded in a new plate on the place where water was leaking out. Below are photos of Derrick welding inside the bunker of 153. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| The blow down cork spindle packing nut needed to be packed with new rope. The blow down cork of these NGG is situated at a very unconvertible place under the boiler, and this was when I realised that another requirement to be able to do this work, is to be able swear for ten minutes without using the same word twice!!! Below are photos taken of the repair work to the Blow down cork of 153. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| THE BARCLAY When we shunted the Folwer out, the Barclay landed on the inspection pit and I grabbed the opportunity to adjust her brakes and to inspect her under frame with the hammer. Below are photos of the Barclay on the pit. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Oupa started with the cleaning of all the locomotives in the shed. Below: The Barclay on the pit and Oupa cleaning 49. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| THE FUNKEY: This week we adjusted the brakes of the Funkey and used her to shunt the mainline clear in Hoekfontein Station. She shunted a total of 19 wagons from the mainline to the storage line. Below are photos of the Funkey performing her duties. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
View a short video clip of the wagons passing the tri-angle points in Hoekfontein Station. Click here >>>
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Sandstone Heritage Trust - Rail News
RN 277 - Keith Stevens reports - The O & K locomotive No. 103112nd November 2006
This month we completed the O & K Firebox. We did get somewhat delayed with this project due to the exceptionally heavy rains which we have experienced here in Howick. However, we fitted the firebox into the boiler and found that we had to make a small adjustment on the firebox ring, thereafter everything fitted "as snug as a bug in a rug".
We then carried on to rivet up and caulk. We manufactured 72 short threaded stays, drilled for test leakage holes and also 10 long ones for on the firebox crown. Inside the firebox, all stays have been hand-peened over and the outside peened over with the use of a riveting gun. We fitted the firebox tube plate centre stay to the boiler barrel. The tanks and cab were then painted. |
![]() |
|
The firebox ready to fit into the boiler
|
![]() |
|
Knocking down the final rivet
|
![]() |
|
Firebox in, drilling & reaming rivet holes
|
![]() |
|
The firebox being fitted to the boiler
|
![]() |
|
Tapping out the stay holes
|
![]() |
|
The stays in place
|
![]() |
|
Peening stays on the inside of the firebox
|
![]() |
|
The Painted Cab
|
![]() |
|
The Painted Tank
|
|
Sandstone Heritage Trust - Rail News
RN 278 - Valuable loco spares sourced in Europe3rd November 2006
The Sandstone Heritage Trust has with the assistance of Philipp Maurer, a close friend of ours
based in Switzerland, managed to source the following valuable steam accessories in Europe. Many of them are of South African origin originally and are being repatriated back to South Africa to be reunited with locos similar to those from which they were removed. |
|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|
![]() |
|
![]() |
![]() |




7th November 2006
SANDSTONE STEAMS AGAIN!!!
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
This week we steamed our Class NG15 number 17 to haul two passenger trains on Saturday. The first train was for the Sunday school children who came all the way from Bethlehem to experience a real Steam train. For most of the children, it was their first time ever on a train. 05H00, Saturday morning Derrick and myself fired up the Kalahari so it would be ready at 08H00. The Kalahari was built in 1931 by Henschel and despite the fact that she turned 75 years old this year, she performed flawlessly. Below are some early morning shots of number 17 steaming her way into the day (and into the hearts of the children). The children are the Steam enthusiasts of tomorrow. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
We were ready at Hoekfontein Station at 07H30 with Petrus as our guard for the day.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
All the children were very excited and could not wait to jump on the train.
At Grootdraai we stopped briefly for a little picnic and all gathered around the steaming wonder. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
We then departed back to Hoekfontein Station and all the children said: Thank You Mr. Mole!
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
We then turned around the train and cleaned the fire for the late afternoon train to Grootdraai and Vailima. With the huge tender fitted to the Kalahari, it is not needed to replenish her thirst very often. We also had a visit from Peter Pauls from Germany (below right) who helped me a lot to get through the long day. Below is a photo of Peter Pauls next to the Kalahari, a very keen enthusiast indeed. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
At 16H00 we were ready to depart and Derrick heated her up for the ride.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Video clip Shovel! (right click and save for windows) >>> Below are photos of the ride to Vailima and Grootdraai. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| At Grootdraai the passengers had some snacks and for the rest it was time for pigeon shooting till dusk. Below left: A very tired Derrick, just after we arrived back in Hoekfontein Station. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||